Transformer and distribution installation at Hpa-An
ELECTRICAL POWER

Electrical Power

Consulting and construction for transmission and distribution.

OUR SERVICES

Planning and implementing power networks

Support from technical standards through installation and supervision.

  1. 01

    Power consulting

    Project management for transmission and distribution, including distribution design standards and national technical specifications.

  2. 02

    Transmission supervision

    Supervision of high-voltage transmission stringing works and coordination of site activities.

  3. 03

    Distribution and substation EPC

    Engineering, procurement and construction for distribution lines, low-voltage systems and substations.

  4. 04

    Transformer installation

    Installation and replacement of transformers and associated distribution equipment.

PROJECT EXPERIENCE

Power infrastructure experience

Planning, supervision and delivery from national grids to local distribution systems.

NEP contract, meetings and field activities
NEP contract, meetings and field activities
WORLD BANK · KEPCO / MOEE

National Electrification Project

NEP implementation management and development of national distribution design standards and technical specifications for the World Bank, KEPCO, and MOEE

Representatives at the 500kV transmission supervision contract signing
Representatives at the 500kV transmission supervision contract signing
KEPCO / MOEE

500 kV double-circuit transmission line

Supervision of 500 kV double-circuit transmission-line stringing between Khankaung (Meikhtila) and Zabakywe (Taungoo) for KEPCO and MOEE

PNDP power network development meeting
PNDP power network development meeting
ADB · KEPCO / MOEE

ADB Power Network Development Project

Consulting for 42 new substations, six substation upgrades, and 843 km of distribution lines.

Transformer delivery and site inspection at Hpa-An
Transformer delivery and site inspection at Hpa-An
MOEP / ESE KAYIN

Hpa-An transformer capacity upgrade

Replacement of two 11/0.4 kV, 100 kVA transformers with 200 kVA units for the MOEP and ESE Kayin project.